Concrete is being poured in the pile hole. As can be seen water is pushed out by the weight of the concrete. Concrete is poured through pipe which was inserted to above 0.5m from the bottom of the hole.
Initial concrete poured was about 4cub.m so as to push water out of pipe and prevent more water from entering.